When We Say Built to Last, We Mean It.
Our experienced team puts its full focus on strategic planning, using innovative technologies, providing flexible product solutions and using sound judgment to deliver turnkey services for projects of any size.
Most Recent Projects
The Beta Crude Connector, a greenfield project, was the most recent showcase of Frontier’s continued success as a premier midstream solutions provider. Frontier designed the system, consisting of approximately 100 miles of crude oil transportation pipeline and approximately 200,000 barrels of operational storage in the Midland Basin of West Texas. The BCC system offered multiple deliveries to the Midland Tank Farm, providing customers with downstream optionality.
The Alpha Crude Connector, a greenfield project, is another recent example of Frontier’s performance excellence. The system consisted of approximately 500+ miles of crude oil gathering and transmission pipeline in Southeast New Mexico and West Texas with more than 300,000 barrels of operational storage and approximately 150,000 bbl/d capacity. Frontier designed the system to provide access to area refineries, three takeaway pipelines, and a rail terminal in the Delaware Basin.
Complete History
We have completed every project with the highest focus on safety, integrity, and quality, while providing competitively-priced services for our customers that create lasting value for our investors.
1 Beta Crude Connector—Midland Basin, TX
2 Alpha Crude Connector—Delaware Basin, NM & TX
3 Maljamar Plant & Gathering System, NM
- 2 cryo plants and treating facilities
- 110+ mmcf/d capacity
- 700+ mi. low pressure gathering
- 38,000 HP compression
4 Bighorn System, WY
- 150+ mi. gathering system
- 250 mmcf/d capacity
- 40,000 HP compression
- 850,000 dedicated acres
5 Fort Union Gathering System, WY
- 100+ mi. of 24″ pipeline
- 500+ mmcf/d
6 Granite Wash—Beaver, Harper, & Ellis Cos. OK
- 100 mmcf/d cryo plant
- 700+ mi. of low pressure gathering system
- 16,000 HP compression
7 Midland Co. TX
- 50 mmcf/d gathering system
- 20+ mi. of high pressure gathering
8 Granite Wash—Roberts Co. TX
- 36 mmcf/d cryo plant
- 9 mi. of 6″ and 8″ steel pipe gathering
- 17 mi. of 4” NGL pipeline into Mid-America Pipeline for redelivery to Mont Belvieu
9 Granite Wash—Wheeler Co. TX
- 30 mmcf/d cryo plant
- 30+ mi. low pressure gathering
- 5,000 HP compression
10 Jones & Fisher Cos. TX
- 10 mmcf/d processing plant
- 500+ mi. low pressure gathering
- 2,500 HP compression
11 Shackelford, Throckmorton, Young, Stephens, & Callahan Cos. TX
- 30 mmcf/d processing plant
- 350+ mi. gathering pipeline
- 3,900 HP compression
12 Logan, Major, Garfield, Noble, Payne, & Kingfisher Cos. OK
- 45 mmcf/d cryo plant
- 1,600+ mi. low pressure gathering system
- 2,000 HP compression
13 Red Oak Field, Latimer Co. OK
- 150 mmcf/d natural gas CO2 treating facility
14 15 16 17 18 Fayetteville Shale, AR
- 5 systems
- 50+ mi. low pressure gathering, compression, dehydration, and amine treating facilities
- 40 mi. of 8-10” high pressure pipeline
- 300+ mmcf/d capacity
19 Lake Charles, LA
- 210 mmcf/d cryo plant
- 13,000 HP compression
1 Indicates Projects with Gas Treating (H2S and/or CO2)
Management Team’s Experience Prior to Frontier
Frontier’s management team brings a wealth of experience that is broad, diverse and extensive, across all major US basins, encompassing both public and private entities throughout the midstream industry.
AnAdarko & Haynesville
- 350,000 HP of compression
- Over 25 gas processing facilities, including condensate stabilization, amine treating, H2S removal and fractionation
- 660 miles of gas gathering and compression
- Amine treating and dehydration
- Produced water gathering and disposal wells
Bakken
- 60,000 HP of compression, including 40,000 HP compression for secondary oil recovery
- 50 mmcf/d gas processing and fractionation, including amine treating, nitrogen rejection and condensate stabilization
- 250 miles of 6” – 12” sour gas gathering and dehydration
- Crude gathering, including 250K of crude storage
- Produced water gathering and disposal
- Gas dehydration and metering facilities
Powder River
- 11,000 HP of compression stations
- 35 mmcf/d gas processing & fractionation
- 550 miles of 4” – 12” gas gathering & compression, including 150 miles of sour gas gathering
- Sour gas treating (17% H2S)
- Acid gas injection
Marcellus
- 600 mmcf/d gas processing; 2 fractionation facilities
- Gas gathering and compression
- Large diameter gas transmission
- Small diameter gas transmission and interconnects
- Compressor stations